Table 5 Person-time inputs (hours) for the various steps of the population estimation method, by activity and site

From: Validity and feasibility of a satellite imagery-based method for rapid estimation of displaced populations

Site name Time per activity (person-hours) Total person-hours Counting time per 1000 population‡
  Obtain imagery Prepare imagery† Count structures Occupancy data search Review occupancy Compute population   
Kutupalong 1.75 7.50 4.50 4.75 0.50 0.25 19.25 0.41
Breidjing 2.75 1.75 5.00 7.50 0.25 0.25 17.50 0.19
Farchana 1.50 1.50 4.75 7.50 0.25 0.25 15.75 0.25
Bambu 1.25 3.00 1.25 15.25 0.75 0.25 21.75 0.21
Mugunga III 1.25 0.75 1.00 15.50 0.75 0.25 19.50 0.51
Sherkole 1.00 1.25 3.75 10.25 0.25 0.25 16.75 0.27
Shimelba 1.00 1.00 4.00 10.50 0.25 0.25 17.00 0.31
Champs-de-Mars 4.25 7.50 7.50 13.50 0.50 0.25 33.50 0.32
Delmas 24, Sollino, Fort National 4.50 6.75 12.00 13.00 0.50 0.25 37.00 0.30
Kakuma 2.75 8.50 20.75 12.25 0.25 0.25 44.75 0.23
Bairro Esturro 6.25 9.50 2.75 23.00 0.75 0.25 42.50 0.29
  1. † Work required to prepare the image for counting, including pan-sharpening if needed, creating the camp outline and the 200 m grid.
  2. ‡ Based on reference population estimate. Only person-time for structure counting is considered, as all other activities are less dependent on the site’s population size.